My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAMBRIDGE
>
16470
>
2300 - Underground Storage Tank Program
>
PR0231532
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2022 11:21:35 AM
Creation date
11/8/2018 9:47:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231532
PE
2351
FACILITY_ID
FA0000185
FACILITY_NAME
CITY FOOD & LIQUOR
STREET_NUMBER
16470
STREET_NAME
CAMBRIDGE
STREET_TYPE
ST
City
LATHROP
Zip
95330
APN
19643032
CURRENT_STATUS
03
SITE_LOCATION
16470 CAMBRIDGE ST
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CAMBRIDGE\16470\PR0231532\COMPLIANCE INFO.PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
10/22/2012 8:00:00 AM
QuestysRecordID
131132
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
993
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y D. Results of Testing/Servidng <br /> Software Version Installed: 14,o <br /> Complete the folio checklist: <br /> Ycs ❑ No' Is the audible alarm operational? <br /> Yes ❑ No* Is the visual alarm operational? <br /> Yes O No* I Were all sensors visually inspected,functionally tested,and conformed operational? <br /> Ye_s 13 No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes O No' If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shutdown? (Check all that apply Sump/french Sensors; ElDispenser Containment Sensors. <br /> Did you confum positive shutdown due to leaks and sensor failure/disconnection? Yes; O No. <br /> 17 Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (Le. no <br /> MA Mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill int(s)and operating rorl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> J�1 Yes' ❑ No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes• No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> -product; O Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* I Is all monitoring umentotional2SLmnrt 's ifications? <br /> •In Section E below,describe how and when these deficiencies wem or will be corrected. n <br /> E. Comments:--a 'r P Y/ h!/ -�� � �11�.�bS �� �{ /���� W" --aI <br /> 1 CpAt�i�fiOd. <br /> Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.