Laserfiche WebLink
tu : JAN 05 ' 94 11 :09 No .005 P .07 <br /> 172 Nest Verdugo "Ave. , Burbank, CA 91-902 <br /> T.E. I LT-3 Hydrostatic Product Line Test Result Sheet <br /> SITE: Cr,as`"kj< -& /20.5- .__ DATE: <br /> AP/i?o W/o it /U/101 <br /> A d7gw, e'd_ <br /> START TIME END TIME TEST VOLUME <br /> PRODUCT /READING /READING PRESSURE RATE RESULT <br /> PASS/ <br /> 00:00/ML. 00:00/ML (psi) (GPH) FAIL <br /> g. Ao O�y. D I114 EcAd <br /> z <br /> U.uti- �r So /2 � /.2 o 00 HISS <br /> AVEM 111 JAB'©° 2� o 00S <br /> I Certify that the above line tests were conducted on this <br /> date according to the equipment manufacturer's procedures and <br /> limitations and the results as listed are to my knowledge true and <br /> correct. <br /> Signature: '.-t ( ry OTTL* 1. -�0 <br /> LJ <br /> Tech. ... Mfr's Cort- 41-- <br /> NOTE : <br /> ert_ #-__NOTE : <br /> The test data collection time period must be fifteen minutes. <br /> The t-est passlfa.il is determined using a threshold of 190 m1. <br /> per hour (0. 05 GPH) rate at 150-/ working prtav�Fure or 50 psi which <br /> ever Ir )esc. '1"he SPH rate is calculated as: ml/ 0. 00106. <br /> Copyright (c) Triangle Envirunmental, Inc. , Mar(:), 1992. HUL <br />