Laserfiche WebLink
ENVIROT* MENTAL HEALTH16EPARTMENT <br /> Out" <br /> - �O. '••.CAG <br /> c• � Donna K. Reran, R.E.H.S. SAN JOAQUIN COUNTY Program Coordinators <br /> ` Director 304 East Weber Avenue,Third Floor Carl Borgman, R.E.H.S. <br /> - Laurie A. Cotulla,R.E.H.S. Stockton,California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> • q ........,i�P. Assistant Director Telephone: 209 468-3420 Margaret Lagorio,R.E.H.S. <br /> trcoe 1� ( ) Robert McClellon, R.E.H.S. <br /> Fax: (209)464-0138 .Jeff'Carruesco,R.E.H.S. <br /> September 5, 2006 Website:www.sjgov.org/ehd/ Kasey Foley, R.E.H.S. <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br /> PO Box 281 <br /> Folsom, CA 95763 <br /> Fax: (916) 984-1117 <br /> Re: Country Marketplace <br /> 1789 W. Charter Way. <br /> Your permit application to install a spill container on the 87 fill riser at the above referenced <br /> location has been approved with the following conditions: <br /> 1. Contact the Fire Department and San Joaquin Valley Air Pollution Control District for <br /> applicable permits. <br /> 2. At least one person who holds the International Code Council UST <br /> Installer/Retrofitter certification and is manufacturer certified for the spill bucket must <br /> be onsite when work is performed. <br /> 3. Each person installing or testing any component must hold a certificate of training from <br /> the manufacturer of that component. <br /> 4. Contact EHD to schedule the following appointments: <br /> a. Prior to backfilling the new spill buckets, EHD must inspect the riser for <br /> cathodic protection. <br /> b. The spill buckets must be tested to ensure they hold a minimum of 5-gallons and <br /> pass a one hour lake test or equivalent after concrete is poured. <br /> 5. Allow 48-hour advance notice for scheduling inspections with this office. <br /> 6. A tank integrity test must be performed once concrete is poured,prior to the contractor <br /> signing off of the jobsite. This office must receive results within 7 days of completing <br /> work. <br /> 7. This permit expires 90 days from the approval date. <br /> 8. Complete and submit a copy of a UST Installation Certificate of Compliance (Former <br /> Form C) for the 87 tank no later than 30 days after work is completed. <br /> Contact Willy Ng to schedule the required inspection at(209) 468-3448. <br /> Thank you, <br /> Willy Ng, HS <br /> Senior Registered Environmental Health Specialist <br />