My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO 1990 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/8/2018 9:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2008
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 1990 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 1990 - 2008
QuestysRecordDate
11/16/2016 9:54:06 PM
QuestysRecordID
3259375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM :B.Z.SERVICESTATION MAIN aNCE FAX NO. :916 371 2540 Aug. 07 2006 03:21PM P4 <br /> ti <br /> F. To-Tank Gauging/SIR Equipment: 11-6beck this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Comlets the followin checklist: <br /> es C3 <br /> es <br /> Has all input wiring been inspected for propor entry and termination, Including testing for ground faults? <br /> es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> as ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> es ❑ No* Were all probes reinstalled properly'? <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section II,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if I LDS are not installed. <br /> Com lets the following checklist: <br /> es ❑ No For equipment start-up or annual equipment certification,iwas ahleak simulated to verity LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate:.�J g.p, g•p• S.p • <br /> os ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> )SfYes ❑ No* For mechanical LI-Ds,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> LLA detects a lock? <br /> Q Yes QVol For electronic LLDs,doe the turbine automatically shut ofi'if the <br /> MIIN/A <br /> Q Yes Q No* For electronic i.LDs, does die turbine automatically shut off if ally portion of the monitoring system is disabled <br /> /A or disconnected? <br /> Q Yes ❑ Ido* For electronic LLDs, does the turbine automatically shut off if any portion of die monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes Q No* Fur electronic[,LDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> os Q No* Wore all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section Il,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments' — <br /> �� Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.