My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO 1990 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/8/2018 9:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2008
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 1990 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 1990 - 2008
QuestysRecordDate
11/16/2016 9:54:06 PM
QuestysRecordID
3259375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQU COUNTY ENVIRONMENTAL HEALTH PARTMENT <br /> N/ UNDERGROUNp STORAGE TANK ..f <br /> RESPONSE PLAN--PAGE 1 (One forth per facility) <br /> TYPE OF ACTION ❑ 1.NEW PLAN [12.CHANGE OF INFORMATION Kit! <br /> I. FACILITY INFORMATIO <br /> FACILITY ID# (Agency Use Only) <br /> FACILITYNAME Roz. <br /> w�T.ey 1�1 �fwat� <br /> FACILITY SITE ADDRESS mi, CITY RN <br /> /7fCGS 114r f7t�1e <br /> 11. SPILL CONTROL. AND CLEANUP METHODS— <br /> —:- <br /> This plan addresses unauthorised releases from LIST systems and supplements the emergency response plans and procedures in the facility's Hazardous Nlaterials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shutoff,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. <br /> ➢ Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated, it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors), it is <br /> contaminated. A thick Boating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not cornpatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released prodwt/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> ;'IH. SPILL CONTROL AND CLEAN—UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept pemmnently on-site is luted in die facility's I Wardens Materials Business Plan This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if a licable <br /> EQUIPMENT LOCATION AVAILABILTTY <br /> an' <br /> /M&, .3�»+ At35aA5 y 4W f64 a ht k 1�o✓Yct1NtK Ali[O <br /> all. Ms. "I. <br /> R12. M2. 02, <br /> R13. R23. R33. <br /> RU. R21. Ria. <br /> RIR R25. R35 <br /> IV. RESPONSIBLE PERSONS <br /> TIIE FOL LOI\I N G PERSON(S)IS/ARE RES PON SI III,E FOR AIITHORI ZI NG ANY WORK NECESSARY I I N D E R TIIIS RESPONSE PLAN: <br /> NAME /2 R40 TITLE R50. <br /> NAME Rat. TITLE 1151. <br /> NAME R42. TITLE "2. <br /> NAME R43. TITLE R33. <br /> a4 . V. INDIRECT HAZARD DETERMINATION <br /> This information is required only when the presence of the hazardous substance can not be determined directly by the monitoring method used(e.g.,where liquid level <br /> measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br /> THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br /> CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: <br /> R50. <br /> SJCEHD-e(06/03)-1/3 06/25(03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.