Laserfiche WebLink
FROM :B.Z.SERVICESTATION MAINT' ')NCE FAX NO. :916 371 2540 Tul. 21 2006 01:53PM P4 <br /> S WRCB,January 2002 page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: EPiping Manufacturer O IndustryStandard Q Professional Engineer <br /> 0 Other(Spec*) <br /> Test Method Used: EfPressura 0 Vacuum 0 Hydrostatic <br /> 0 Other(Speco) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run 4 Piping Run# Piping Run# <br /> Piping Material: Q <br /> Piping Manufacturer: v\ 2 u 1 tl v1 <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: 0.5 <br /> Method and location of <br /> piping-run isolation: Tey-vv. \D&ct IT,v yr t <br /> Wait drac between applying— <br /> pressure/vacuum/water and <br /> StalSln tOst: <br /> Test Start Time: 10 to <br /> Initial Reading(R,): (y L <br /> Test End Time: <br /> Final Reading(Rh): <br /> Test Duration: <br /> Change in Reading(RrR j; <br /> Pam/Fail Threshold or <br /> Criteria: <br /> COMMetttS--(Include Information on repairs made prior to laslft and reeomoundedfollow-mforfall ed tests) <br />