My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO 1990 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/8/2018 9:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2008
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 1990 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 1990 - 2008
QuestysRecordDate
11/16/2016 9:54:06 PM
QuestysRecordID
3259375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM :B.Z.SERVICESTATION MAINT' ')NCE FAX NO. :916 371 2540 Tul. 21 2006 01:53PM P4 <br /> S WRCB,January 2002 page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: EPiping Manufacturer O IndustryStandard Q Professional Engineer <br /> 0 Other(Spec*) <br /> Test Method Used: EfPressura 0 Vacuum 0 Hydrostatic <br /> 0 Other(Speco) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run 4 Piping Run# Piping Run# <br /> Piping Material: Q <br /> Piping Manufacturer: v\ 2 u 1 tl v1 <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: 0.5 <br /> Method and location of <br /> piping-run isolation: Tey-vv. \D&ct IT,v yr t <br /> Wait drac between applying— <br /> pressure/vacuum/water and <br /> StalSln tOst: <br /> Test Start Time: 10 to <br /> Initial Reading(R,): (y L <br /> Test End Time: <br /> Final Reading(Rh): <br /> Test Duration: <br /> Change in Reading(RrR j; <br /> Pam/Fail Threshold or <br /> Criteria: <br /> COMMetttS--(Include Information on repairs made prior to laslft and reeomoundedfollow-mforfall ed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.