Laserfiche WebLink
FROM :B.Z.SERUICESTATION MAINT' INCE FAX NO. :916 371 2540 Tul. 21 2006 01:54PM P7 <br /> SWRCB,January 2002 Page k of <br /> 7, UNDER-DISPENSER CONTAINMENT WDQ TESTING <br /> Test Method Developed By; C Manufacturer ❑Industry Standard U Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum� Flydrostatic <br /> Ll Other(specify) <br /> Test Equipment Used: <br /> Equipment Resolution: <br /> UDC# UDC# f UDC# UDC# <br /> UDC ManuFitcturcr: ' <br /> UDC Material: _ - <br /> UDC Dope the t _ <br /> Haight from UDC$otmrh to'I'op --`"- <br /> Of Hi hest P1 in Penetration: t r! <br /> Height from UDC Bottom to �� r <br /> Lowest Electrical Ponctration: <br /> Condition of UDC prior to <br /> tcstur <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both E�Yes 0 No j<NA Y �'iA 0 <br /> es U No !'" yes 0 No 0 NA 0Y. 0 No U NA <br /> roduct and water T `_ <br /> Turbine shutdown r onse time 4 <br /> Is system programmed for fail• <br /> safe shutdown?' <br /> yes U No U NA �"es ON U NA Dyes ONO DNA Dyes ONO DNA <br /> Was fail-safe verified to be <br /> Operational?* 0 Yes U No NA 0 Yes 0 No DIA U Yes O No DNA Dyes ONO U NA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startirm test <br /> Test Start Time: <br /> ZP <br /> Initis]Readias ; <br /> Test End Time: . <br /> Pinel Reeding <br /> Test Duration: - 17 -- <br /> Change in Reading(R,-R,): , .. <br /> Passmail Threshold or.Criteria: <br /> Was sensor removed for testing? 1 0 Yes o 0 NA ❑Yes o 0 NA 0 Yes 0 No DNA U Yes 0 No DNA <br /> Was sensor properly replaced and U <br /> verified funcUonnl after testing? Yes o ❑NA 0 Yas oA U NA 0 Yos O No DNA ❑Yes CI No ❑NA <br /> COrtlment9--(include in ormatlon wt reeafrs made prior to tertinA and recommended follow-try or jailed reds) <br /> ' If the satire depth of Ilse UDC le not tented, specify how much was tested. If the answer to gny of tlse questions indicated with an <br /> asterisk(•)is"NO"or"NA",the entire UDC must be tested. (Soo SWRCB LO-160) <br />