Laserfiche WebLink
BUSINESS OFFICES Fax 209-9432811 Mar 11 09.23 <br /> 00"9 PROCEDURES FOR Bakersfield rift Papw <br /> fs rint91D4RY CONTAINMENT TESTING Enviroame11Mr0e <br /> 1715 Chester Ave <br /> P rt t ot; Bakersfield, CqA.933b1'' <br /> a. <br /> Tel: (661)326-3979 <br /> a <br /> x TMe se"adary'eontainment systems to be tested Include: <br /> �# 'LIST annular space <br /> t <br /> secondary containment piping <br /> under-dispenser containment,turbine slurps and over-spill buckets. <br /> l3 Me fgpowhrg describes the scope of work for each inspection/test: <br /> (y: 1. CONTRACTOR QUALIFICATIONS <br /> Won flit:contractor can start work: <br /> 3 a. Contractor trust have certification from manufacturer of secondary equipmend <br /> components. The equipment at all facilities for`which manufacturer cettification�or <br /> k" testing is required include: <br /> l 1. Xerxes, Owens Coming, Modem Welding and Ioor UST's <br /> 2. Amemn and AO Smithi <br /> P Pte& <br /> b. Contractor must have proof of HAZWOPR training for employees. <br /> J, <br /> c. Contractor must have supplied current OSHA log$to West Coast Retail Business <br /> Unit. <br /> .` <br /> A pre-test inspection will be performed. The goal of the inspection is to confirm the facility cin <br /> I be tested,,identify components that obviously will not pass the testing, identify tools required tb <br /> olote testing,and.prepare the facility for testing. <br /> rjtnpi <br /> a. Clean sumps, spilt buckets and UDC with pressure washer/steam cleaner and trabsibr <br /> generated liquid and debris into labeled drums for disposal- <br /> j-. <br /> isposal_ <br /> + b. Inspect turbine sumps and overfill buckets to ensure penetration fittings are installed <br /> �, and the bolts are tight, there are not obvious cracks or holes in the sump/bucket, <br /> ;.t• plugs are installed and tight in electrical conduit and j-boxes,test boots are present <br /> I a and can be secured and the sump/bucket is free of debris and liquid and the overfill <br /> drain valve is scaling properly. <br /> c. Inspect the underdispenser containment(UDC) sumps to ensure penetration ftin <br /> g, <br /> are installed and the bolts an tight,there aro no obvious cracks or holes in the stgnps. <br /> 4 Plugs are installed and tight n electrical conduit and j-boxes,test boots are presypt <br /> Sc £ d d b <br /> d ancan e secureansum Slee of debris end liquid. <br /> id <br /> r'+ P �is . <br /> i d. Document repairs made on work acknowledgment form and forwarded to <br /> Bakersfield Fire Department,Office of Environmental Services. Attn: Steve <br /> Underwood. <br /> J.": <br /> i 1 he statins may remain operating during the inspection and cleaning/repairs as long asthe sailty <br /> c the workers,employees and public is not jeopardized. <br /> 1; � <br />