My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1990 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
1789
>
2300 - Underground Storage Tank Program
>
PR0506538
>
COMPLIANCE INFO 1990 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:21 AM
Creation date
11/8/2018 9:47:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990 - 2008
RECORD_ID
PR0506538
PE
2361
FACILITY_ID
FA0007486
FACILITY_NAME
COUNTRY MARKETPLACE
STREET_NUMBER
1789
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16337023
CURRENT_STATUS
01
SITE_LOCATION
1789 W CHARTER WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\CHARTER\1789\PR0506538\COMPLIANCE INFO 1990 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 1990 - 2008
QuestysRecordDate
11/16/2016 9:54:06 PM
QuestysRecordID
3259375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOA--.,*QWN OUNTY ENVIRONMENTAL HEALTH DE TNTENT <br /> UNDMILCAOUND gTOleACE TANK <br /> a� MOMMUM 't P"N_11A(11112 1 <br /> TYPE OP ACTION C3 1.NEW PLAN n 2.CHANCE OF INPOI4MA710N <br /> m --�FIZJNI'fPJTLiNL"!§YY� AYF4A a A L <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S). <br /> FACILITY ID#(Agen y Uae Only) _ e <br /> !1 FACILITY NAME <br /> FACILITY SITE ADDRESS > (g/, ��d>fi2 �rr�y Moa, CITY .SYdf.L'70.J Mos <br /> Ix-� r <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensms,probes,-line leak detectors,etc.)be performed in Moa <br /> accordance with the equipment manulbcuuers'instmctions,or annually/,whichever is more.frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1{,f ).ANNUALLY ❑ 99.OTHER(Specify):_ M07 <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e...location of each sensor, <br /> Zine leak deteetw,monitoring systm control pv 1,etc.). If you already have a diagram(e g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form Hamrdous Materials Business Plan etc. which shows all«wired information include it with this Ian. <br /> CORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M1J <br /> ONTINUOUS ELECTRONIC MONITORII�F TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SBOONDAPY CONTAIPNMENT IS: a.DRY ❑ b.LIQUID FILLED ❑.c.UNDER PRESSURE ❑ d.UNDER VACUUM Mit. <br /> PANEL MANUFACTURER: , lL QLO M" MODEL#: Mu. <br /> LEAK SENSOR MANUFACTURER I L It A-A W Mta. MODEL#(S). `I 1611 1 o - a Mts. <br /> ❑ 2.AUTOMATIC.TANK GAUGING(ATO)SYSTEM USED TO MONITOR SINGLE WAIL TANK($j <br /> PANEL MANUFACTURER: ana, MODEL#: mit <br /> IN-TANK PROBE MANUFACIURER: Mls MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a..CONTINUOUS ❑ b.DAILY/NIGHTLY [3 c.WEEKLY ]VC20. <br /> ❑..d.MONTHLY ❑.e.OTHER(Specify): W1' <br /> PROGRAMMED TESTS: ❑.a 0.1.g.p.h. ❑.b..0.2 g.p.h. ❑ c.OTHER(Specify): Mu mm <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a MANUAL PER 23 CCR§2646 ❑ b..STATISTICAL PER 23 CCR§2646.1 ' <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MM)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS aM <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR 12643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTTIER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a DAILY ❑ b,WEEKLY(R"-,-es�cy.rOm.eO <br /> ❑ 99.OTHER(Specify) MN- <br /> : <br /> T W6, 19 W,MpabWarollm, Now <br /> MO, 170RTNG IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) FDO. <br /> I.CONTINUOUS ELECTRONIC MONTTORING F PIPING SUMP(SYMMCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS//'' aDRY ❑. b.LIQUID FILLED [3 a UNDER PRESSURE [Id.UNDER VACUUM Mal. <br /> PANEL MANUFACTURER: . ; L6n¢w am MODEL#: E{ Mil, <br /> LEAK SENSOR MANUFACTURER: r 7 MX MODEL#(S): -, � ZO fi nua. <br /> WILL A PIPING LEAK AT-ARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? p�ap,y a.YES G b.NO <br /> WILL FAILURE/DISCONNECTION OF THEua MONITORING SYSTEM TRIGGER AUTOMATIC.PUMP SHUTDOWN? aYES ❑ b.NO AO7 <br /> ( .MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS. 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED � <br /> MLLD MANUFACTURER(# V&j r �O f le p !*rjce dOB MODEL#(S). Z V d X( wf art9. <br /> ELECTRONIC LINE LEAK DETECTOR( ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS a <br /> ELLDMANUFACCURER: SS M00 MODEL# a Mat. <br /> PROGRAMMED LINE INTEGRITY TESTS. [--) a MINIMUM MONTHLY 0.2 g.p.h. M b.MINIMUM,ANNUAL 0.1 g.p.h. Ma <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ n.YES ❑ b.NO rias. <br /> WILL E.LD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ e,YES ❑ b.NO W4. <br /> ❑ 4.INTEGRITY TESTING `.,,� <br /> TEST FREQUENCY: ANNUALLY [3b.EVERY 3 YEARS. El C.OTHER(Specify) Mas- <br /> ❑ 5.VISUAL MONITORING DONE: a.DAB.Y ❑ b.WEEKLY* ❑ C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED-- Mn. <br /> •Rrnur'almy9p 41 •".Alb..ed Por rtaitibmaof mEueied emeranry gmeraw ad gP�n6aM'°er H9C 43336i.e(bK3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(aR3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Speci(v) Mas. <br /> SICEHD-d(07/03).1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.