Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. III��p``` <br /> Complete the following checklist: r' �^. F � ' f t 1-1 U <br /> ® Yes ❑ No" Has all input wiring been inspected for proper entry and termination,including testing for ground faults? !� (�/%, <br /> ® Yes El No* Were all tank gauging probes visually inspected for damage and residue buildup? 201163" <br /> ® Yes ❑ No" Was accuracy of system product level readings tested? <br /> ® Yes ❑ No' Was accuracy of system water level readings tested? :�TVM_M ENTAL <br /> ® Yes ❑ No' Were all probes reinstalled properly? •T�.1��r- <br /> 0 Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be contacted. <br /> Line Leak Detectors(LLD(: ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.P.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No' For mechanical LLDs,does the LLD restrict productgow I it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off 9 the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No' I For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 87 120 3 24 17 PASS <br /> 91 1230 6 26 21 PASS <br /> DSL 100 6 26 21 PASS <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />