My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2019 11:30:41 AM
Creation date
11/8/2018 9:48:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\C\CHEROKEE\800\PR0231325\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
3/28/2017 3:08:03 PM
QuestysRecordID
3360260
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • • :Page Yof: I ' <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional EnginlkPR 2 5 2 16 <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10 x 15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 30' Approx.42' Approx.35' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> i in -run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and startin test: <br /> Test Start Time: 10:00 10:05 10:10 <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 11:00 11:05 11:10 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour I Hour I Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.