Laserfiche WebLink
2� 0 <br /> Installation and Maintenance Manual <br /> CNI Manufacturing Phase I Vapor Recovery System Page 4 of 28 <br /> Figure A-1 <br /> Typical Product Side Installation Using CNI Manufacturing System <br /> Typical Product Side XXXX-311 G3 <br /> Gravitycover <br /> Snap-tight Cover <br /> 64 <br /> Product cap <br /> Q <br /> XXXX-31103 <br /> $pill container assembly a m o L, `� A0030.124 <br /> EMCO WHEATON <br /> Product rotatable adaptor <br /> s <br /> RP12-PUSH x <br /> Drain Valve Assembly 200.JN <br /> Drop tubc <br /> jam-nut <br /> RP101 <br /> .210' -O--ring DT100 <br /> Bursar rubber Drop tube <br /> (Por drop tuba) n ;, <br /> NOTE: <br /> Unless noted,all products are <br /> manufactured by CNI MPG. <br /> NOTE: r <br /> The maximum distance between the bottom <br /> of the tank and the bottom of the drop tube <br /> should be no more than 6'. ' <br /> Scala=N.T.S. <br />