Laserfiche WebLink
r <br /> Installation and Maintenance Manual r J <br /> CN�I{[Manufacturing Phase I Vapor Recovery System Page 8 of 28 <br /> F (� RCM1 MEMO <br /> CTURIWj LME01 <br /> Installation Instructions For A 2 Point System, Product Side Spill Container <br /> (DT100, Drop Tube) <br /> Drop tube <br /> __ - A RP101 <br /> �.. 0 .210" "O"-ting <br /> Buna N,rubber <br /> View A-A <br /> This dimension will <br /> vary depending on Droep <br /> the burial <br /> 4'N.P.T.tub�_,_. .0"-rin9 <br /> 45°Cut tfsll <br /> Riser pie Buna N. <br /> i <br /> rubber <br /> 6` � 6" <br /> (Bottom oil) 2. _ (Bottom o tank) Tank <br /> burg <br /> (Fig. 1) <br /> Tank <br /> Step 2 (Fig. 2) <br /> Install drop tube <br /> 1. Measure the distance between the top of the product riser pipe and the bottom of the tank. <br /> 2. Cut the solid drop tube at a 45"angle, 6 inches from the the extreme top cut,to the bottom <br /> of the tank. For a straight cut,the dimension should also be 6"from the bottom of the drop <br /> tube to the bottom of the tank-(See Fig. 1). Cut the drop tube to the referenced dimension <br /> using a hacksaw equipped with a fine tooth blade. <br /> NOTE: For an angle cut,the drop tube may not exceed 2 inches from the bottom of the tank. <br /> 3. Carefully remove all cutting burs from the edge of the drop tube. <br /> C Insert the drop tube on to the tank riser-(See Fig. 2). Carefully lower the drop tube Into the <br /> tank,unfit the drop tube collar rests on the edge of the product riser pipe.Verify the drop <br /> tube"O"-ring is installed and property secured. <br /> Rg UO1803 Page 3 of 7 <br />