My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
COMPLIANCE INFO 2001-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/8/2018 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2006
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\C\COUNTRY CLUB\2802\PR0516736\COMPLIANCE INFO 2001-2006.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Installation and Maintenance Manual r J <br /> CN�I{[Manufacturing Phase I Vapor Recovery System Page 8 of 28 <br /> F (� RCM1 MEMO <br /> CTURIWj LME01 <br /> Installation Instructions For A 2 Point System, Product Side Spill Container <br /> (DT100, Drop Tube) <br /> Drop tube <br /> __ - A RP101 <br /> �.. 0 .210" "O"-ting <br /> Buna N,rubber <br /> View A-A <br /> This dimension will <br /> vary depending on Droep <br /> the burial <br /> 4'N.P.T.tub�_,_. .0"-rin9 <br /> 45°Cut tfsll <br /> Riser pie Buna N. <br /> i <br /> rubber <br /> 6` � 6" <br /> (Bottom oil) 2. _ (Bottom o tank) Tank <br /> burg <br /> (Fig. 1) <br /> Tank <br /> Step 2 (Fig. 2) <br /> Install drop tube <br /> 1. Measure the distance between the top of the product riser pipe and the bottom of the tank. <br /> 2. Cut the solid drop tube at a 45"angle, 6 inches from the the extreme top cut,to the bottom <br /> of the tank. For a straight cut,the dimension should also be 6"from the bottom of the drop <br /> tube to the bottom of the tank-(See Fig. 1). Cut the drop tube to the referenced dimension <br /> using a hacksaw equipped with a fine tooth blade. <br /> NOTE: For an angle cut,the drop tube may not exceed 2 inches from the bottom of the tank. <br /> 3. Carefully remove all cutting burs from the edge of the drop tube. <br /> C Insert the drop tube on to the tank riser-(See Fig. 2). Carefully lower the drop tube Into the <br /> tank,unfit the drop tube collar rests on the edge of the product riser pipe.Verify the drop <br /> tube"O"-ring is installed and property secured. <br /> Rg UO1803 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.