Laserfiche WebLink
FEB-20-2006 15: 12 Service Station Systems 408 938 8888 P.05/O7 <br /> Monitoring System Certification-Pam!of 3 *0/ <br /> Site Address: 2802 Country Club Blvd. A Delano Ave Date of Testing/Servicing: 1/24106 <br /> D. Results of Testing/ Servicing <br /> Software Version Installed 121 <br /> Com tete the followin x checklist: <br /> ®Yes 5 NO*7 Is the audible alarm o eratiomd? <br /> 3 Yes 0 No* Is the visual alarm operational? <br /> ®Yes 0 No* Were all sensors visually inspected,funetionally tested, and confirmed o rational? <br /> ®Yes 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ®Yes 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> O NIA operational? <br /> ®Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> 0 N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors inittaic <br /> positive shut-down'? (Check all that apply) ®Sump/Trench Sensors; ®Dispenser Containment Sensors. <br /> Did vou confirm positive stmt-down due to leaks and sensor failure/disconnection? ®Yes 0 No <br /> 0 Yes 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(U. no <br /> 0 N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating ro er ? If so,at what percent of tank capacity does the alarm tri er7 90 %, <br /> 0 Yes* 0 No Was any monitoring equipment replaced?11 yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E, below. <br /> DYes* ®No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 4�" 0 Product; D Water. If es describe causes in Section E,below. <br /> ®Yes 0 No* Was monitorin stem set-up reviewed to ensure Proper settings? Attach set-up reports, if applicable.) <br /> ®Yes 1 0 No* I Is all monitoring equipment operational per manufacturer's specifications? <br /> " In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br />