Laserfiche WebLink
ENVIROCENTAL HEALTA)EPARTMENT <br /> SAN JOAQUIN COUNTY <br /> r? :y Donna K. Heran, R.E.H.S. Unit Supervisors <br /> %i'`: - :< Director 304 East Weber Avenue,Third Floor Carl Borgman,R.E.H.S. <br /> Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> • c... ��4• Program Manager Telephone: (209)468-3420 Douglas W.Wilson, R.E.H.S. <br /> \6,211U6 Margaret Lagorio,R.E.H.S. <br /> Fax: (209)464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jeff Carruesco,R.E.H.S. <br /> Elite IV Contractors <br /> 2535 Wigwam Drive <br /> Stockton CA 95205 <br /> Re: Morada Chevron @ 10878 N.Hwy 99,Stockton <br /> The permit to perform a secondary containment repair in the Ameron product piping has been approved with the following conditions: <br /> 1. Contact the local fire department and San Joaquin Valley Air Pollution Control District for <br /> applicable permits. <br /> 2. At least one person who is holds the ICC UST Installer/Retrofitter Certification must be onsite while US T components are <br /> being installed.Additionally,the individual must have certification from the manufacturer of the equipment. <br /> 3. If concrete is broken near or above the underground storage tank then a third party certified tank integrity test must be <br /> performed once concrete is poured.Results must be received by EHD within 7 days of completing the job <br /> 4. A third party certified piping line tightness test must be performed once concrete is poured.Results must be received by EHD <br /> within 7 days of completing the job. <br /> 5. All piping and connections(including penetrations)shall bear a UL label. <br /> 6. All piping must slope to a containment sump with an audible and visual alarm. <br /> 7. All equipment in contact with backfill must have corrosion protection. <br /> 8. Contact EHD for the following inspections: <br /> a. Primary piping <br /> b. Secondary piping <br /> c. Slope test <br /> 9. Any changes in information or scope of work must be submitted to EHD prior to commencing work. <br /> 10. Submit an As-Built plan to EHD within 7 days of completing the job. <br /> 11. Allow 48-hour notice for all inspections. Contact Michelle Le at(209)468-9847. <br /> 12. Permit expires May 6,2006. <br /> If you have any questions please contact me at(209)468-9847. <br /> Thankyou, <br /> Michelle Le,REHS <br /> Senior Registered Environmental Health Specialist <br />