My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2005 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:48:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2010
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2005 - 2010 .PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2010
QuestysRecordDate
5/17/2017 6:13:49 PM
QuestysRecordID
3384372
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: • ® Check this box if tank gauge used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-lank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> i Section H,below,describe how and when these deficiencies were or will be corrected. <br /> ,e Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the followln checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ® Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus properly calibrated? <br /> ® Yes ❑ No` For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,does the turbine automatically shutoff if any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> ❑ Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> i Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Comments: - <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.