Laserfiche WebLink
S WRCB.January 2002 Page 7 of 7 <br /> FAST&EASY CHEVRON <br /> Hwy 99&Eight NUIc Road <br /> Stockton,CA <br /> January 17,2005 <br /> 9.SPILLIOVEIMLL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> S ill/Overflll Containment Boxes are Present but were Not Tested <br /> Test Method Developed By [ ]Spill Bucket Manufacturer [X 1 Industry Standard [ ]Professional t'.egineer <br /> Otho a <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> Other <br /> Test wpment Used: Water Equipment Resolution: <br /> 1::.:.i:HIM <br /> r <br /> Soil]Box#89 Octane SBI Box# Spin Box# S ill Box#I <br /> Bucket Diameter: IT, <br /> Bucket Depth, 13" <br /> Wait time between <br /> appbing 15 Minutes <br /> • pressure/vacuu t/waterand <br /> starting test <br /> Test Start Time: 9:00 AM <br /> Initial Reading(RI): 13" <br /> Test End Time: 9:30 AM <br /> Final Reading 13" <br /> Test Duratiorr 30 MIN. <br /> Change in R -Rl -0- <br /> Pow/Fail Threshold or -0-Loss <br /> Criteria: <br /> eat' is „ ® G - asr . �.. .> 1►il Pam <br /> Comments—(include information on repairs made prior to tesdng,and recommenried follow-up for failed rests) <br /> BUCKET HELD AT PREVIOUS TEST,BUT DRAIN DIDN'T DRAIN. REPLACED DRAIN VALVE AND RE- <br /> TESTED. TEST O.K. DRAIN O.K. <br /> • <br /> 2 -Ci 002E 131763SU1 dH WUES : 11 2002 02 NUC <br />