Laserfiche WebLink
SWRCB.January 2002 Page 7 of 7 <br /> FAST&EASY CHEVRON <br /> Hwy 99&Eight Mile Road <br /> Stockton,CA <br /> January 17,2005 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: [ 1 Spill Bucket Manufacturer [X 1 Industry Standard [ l Professional Engineer <br /> Other(Specify) <br /> Test Method Used: [ 1 Pressure [ ]Vacuum [X l Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Water Equipment Resolution: <br /> Spill Box#89 Octane Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 12" <br /> Bucket Depth: 13" <br /> Wait time between <br /> applying 15 Minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 9:00 AM <br /> Initial Readin (Rl): 13" <br /> Test End Time: 9:30 AM <br /> Final Readin R 13" <br /> Test Duration: 30 MIN. <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or -0-Loss <br /> Criteria: <br /> Test Result: X Pass Fail Pass Fail Pass Fail I I Pass I I Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BUCKET HELD AT PREVIOUS TEST, BUT DRAIN DIDN'T DRAIN. REPLACED DRAIN VALVE AND RE- <br /> TESTED. TEST O.K. DRAIN O.K. <br />