Laserfiche WebLink
May 2516 08:54a p,3 <br /> PLEL;Lt VIED <br /> D. Results of TestinglServicing MAY 2 b 2016 <br /> Software Version Installed: <br /> Complete the follows checklist: TkL <br /> X Yes -. No' Isthe audiole alarm operational? <br /> X Yes ❑ No' Isthevisual alarm operational? <br /> X Yes I ❑ No• Were all sensors visually inspected,functionally tested,and confirmed operationaR <br /> X Yes ❑ No' Were all sensors instaaed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper ration? <br /> Yes n No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X WA <br /> X Yes ❑ No' For pressurized piping systems, does the turbine automatically shut down if Ne piping secondary containment monitoring system <br /> n WA defects a leak,fails to operate,or is elecalrafy disconnected? if yes:whlch sensors initiate positive shutdown? (Check all drat apply) <br /> X Sumprrrench Sensors; Dispenser Containment Sensors. Did you confirm posilive shut-rl n due to leaks and sensor <br /> fallureldisconnection? X Yes; D No. <br /> ❑ Yes C No' For tank systems that utilize the numitoring system as the primary tank overfill wamlrg device ite.no mechanical overfill prevention <br /> X WA valve is Installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the Alam triggarl % <br /> X Yes' No Was any monitoring equipment replaced? If yes, Identify specific sensors, probes, or other equipment replaced and get the <br /> manufacturer name and modal for as replacement parts in Section E,below. <br /> ❑ yes' X No Was liquid found inside any secondary conta"nmerd systems designed as any systems? (Check at that apply)❑Product; ❑Water. If <br /> .describe causes in Section E,below. <br /> X Yes I No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X Yes 3 W Is all monitoring equipment operational per manufacturer's specifications? <br /> .In Seefion E Wow,describe how and when these deficiencies were orwill be corrected. <br /> E. Comments: <br /> Monitoring System Cortification Page 2 of 4 12le7 <br /> 2,'21/07 <br />