i i <br /> 15. Secondary Containment Test requirements must still be satisfied prior to any construction work. One of the <br /> following options must be met to fulfill the SB989 requirement(due December 31, 2002). <br /> a. The annular space must be tested prior to removal of trench system, if fuel is to remain in the tanks <br /> during the retrofit. <br /> b. Obtain a temporary closure permit from EHD until the system fulfills the secondary containment test <br /> requirements. <br /> If fuel is to remain in the tanks,the monitoring to the secondary containment must be continuously maintained. <br /> Leaving a system under a vacuum does not constitute continuous monitoring. <br /> If you have any further questions,please call me at(209)468-3468. <br /> Thank you, <br /> ��0--�' C'� <br /> Dina Abate, EHS <br /> Environmental Health Specialist <br />