Laserfiche WebLink
SITE SPECIPIC SAFETY pLAN <br /> INTRODUCTION <br /> This document describes the health and safe` r <br /> activities planned ;n ne g - �Y procedures for the <br /> form-n z preliminary site investigation at <br /> subcontractors will follow thi All personnel and <br /> s plan. The prime responsibility for <br /> employee safety lies with each company that is involved in the work <br /> for it' s own employees. It is expressly intended that all project <br /> work will comply with applicable sections of the California <br /> occupational Health and safety code. All parties working on this <br /> project will maintain a general re5pOA5'billty t0 identify and <br /> correct any health and safe--y hazards and are. responsible for eerking <br /> a safe manner. <br /> Key Personnel <br /> Project personnel who r"_11 have overall respons2b_l._ty for D-e safe <br /> operation cf Lis are: <br /> Site contac=: G H U c i< DO w D Y <br /> DAN Ny EN5A- F- V <br /> Project manager and C 14- U C /L D o w D )' <br /> Site Safetv Officer <br /> =1it�e 3V_ Cont�racrors (209) Sbl 6337 <br /> fax 45'• 63A2 <br /> project Manager and Safety Of=icer Responsibilities : <br /> * To conduct initial site - <br /> sz=ety trz_nina for all project <br /> field team members as described in this document, <br /> * To assure all field team personnel have read and <br /> Understand the Heal-__h and Safety <br /> * To assure that all work oerfoT_me,� On tA.S DrC�eCt .5 <br /> conducted in a safe_ manner, <br /> * To coordinate with field personnel - watch, traffic <br /> fie-watch, �_ef__c <br /> control and site security, <br /> SITE S+FETY PLM (SSP) _ 1 <br />