Laserfiche WebLink
i <br /> • a <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(4) and 2641(h) CCR. <br /> Facility Name TIGER EXPRESS STORE #3 <br /> Facility Address 14800 West HWY 99 FRONTAGE RD. MANTECA, CA. 95336 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank . CONTINUAL WNITORING OF INTERSTITIAL SPACE WITH AUDIO & VISUAL ALAM REPORTS <br /> PLUS CUNTINOUOS STATISTICAL LEAK DETECTION VIA INVENTORY PROBE SENSORS <br /> Piping CONTINUAL- MONITORING, uF DOUBLE CONTAINED PIPING WITH AUDIO & VISUAL ALARM REPORTS <br /> PLUA PRESSURE LINE LEAK DETECTORS <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> TankyFFDFR lynT TIS-Zn inT MINTTORTNG SYSTEM, WITH MAG T INVENTORY PROBFS> INTFRSTITTAI <br /> SENSORS AND STP CONTAIM4ENT SUMP SENSORS <br /> Piping SAMF AS ARQVF <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> ALL PROBES CAN BE ACCESSED IN THE TURBINE (STP) CONTAINOff SUMP <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> ,TERRY t4'X1RE O0FR <br /> 1XJTS 0 TERO UNIT MAP?ArER <br /> BILL SAVAGE OPERATIONS SUPERVISOR <br /> E. Reporting format for monitoring: <br /> Tank COMPUTER GENERATED ALAR4 HISTORY & INVENTORY REPORTS DAILY AND ON DEMAND <br /> Piping pT.T.TI'C Am AuTn1 ATTr• -gPTu Ytt.><.i <br /> F. Describe the pre'-entive maintenance schedule for the monitoring equipment. Note: <br /> IMaintcnancc moist be in accordance with the manufacturers' maintenance schedule <br /> butnotlessthancvcryLmonths:DAILY COMPUTER GENERATED STATISTICAL ANALYSIS, SELF <br /> DIAGNOSTICS AND ANNUAL MECHANICAL AlAfd`4`SENSOR ASSURANCE OF OPERATION TESTS. -_ <br /> G. Describe the training necessary for.the operation of UST system, including piping, <br /> and the monitoring equipment: <br /> ALL PERSONNEL ARE TRAINED DURING THEIR INTITAL 30 DAYS OF EMPLOYMENT BY AN <br /> EXPERIENCED SUPERVISORY PERSON <br />