Laserfiche WebLink
Apr~ 21 02 11 : 36a F1i*v Contractors Inc 20946 142 p. 2 <br /> ARB Approved IOM—Healy/Veeder-Root Phase II EVR System—VR-202-A (Ovation Dispenser) . Page 119 <br /> WAYNE-DRESSER OVATIONTIM SERIES DISPENSER RETROFIT <br /> for HEALY SYSTEMS, INC. <br /> MODEL VP1000 <br /> VAPOR RECOVERY ASSIST SYSTEM <br /> (KIT Z079) <br /> OUTLINE <br /> 1. Purpose <br /> 2. Safety <br /> 3. Models Covered <br /> 4. Parts Lists <br /> 5. Tools Required <br /> 6. Dispenser Access <br /> 7. Survey Scope Of Work <br /> 8. Wayne-VAC Removal <br /> 9. Balance Removal <br /> 10. Installing The Healy VP1000 System <br /> 11. Connecting Vapor Lines <br /> 12. Installing The Sealed Nipple Assembly <br /> 13. Wiring Inside The Electronics Compartment <br /> 14. Connecting Healy Systems Dispensing Equipment <br /> 15. VP1000 Theory Of Operation <br /> 16. Testing The System <br /> 17. Trouble Shooting The VP1000 <br /> 18. VP1000 Vane & Rotor Service & Replacement Guide <br /> Start-up/ New Installation/Warranty/Annual Testing Form (Rev. 04/05) <br /> Healy Systems, Inc. Website: http://www,healysystem.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual(August 31, 2005) Fax: 603.882.5189 <br /> OMMUNMEMMMOft <br /> Healy Systems. Inc. —the innovative leader of Stage lI vapor recovery equipment <br />