Laserfiche WebLink
np'r 21 02 11 : 37a Eli(, Iv Contractors Inc 20946 142 p. 6 <br /> ARB Approved IOM— HealyNeeder-Root Phase II EVR System—VR-202-A(Ovation Dispenser) Page 132 <br /> 11. CONNECTING VAPOR LINES: (ref. Photos P, Q & R) <br /> NOTICE: ALL VAPOR LINES MUST BE INSTALLED TO BE NATURALLY DRAINING, <br /> WITHOUT ANY DIPS OR TRAPS THAT WOULD CAUSE BLOCKAGE. <br /> 4 ) � ; , <br /> h «f��aaP'Y I I <br /> V y <br /> \ t <br /> r <br /> cPh <br /> k <br /> YM <br /> 1�I <br /> PHOTO P PHOTO Q <br /> ❑ Make the pipe thread connections below using pipe thread compound as required. <br /> ❑ Get the 112" NPT x 5/8" x 5/8" flare tee and insert between the two preformed 5/8" copper <br /> tubes to be sure the tubes can be securely tightened, but DO NOT COMPLETELY <br /> TIGHTEN. <br /> ❑ Remove the tee and thread into the 112" street elbow, tighten to position shown in photo <br /> Q. To the elbow, add the 112" reducing tee and orient tee so the 1/4" branch opening is <br /> 750 to the elbow (facing the installer) with the elbow on the right and facing up. Install <br /> the 1/4" plug into the 114" opening on the tee. <br /> Install the 112" close nipple into the tee and follow with the 112" ball valve. Orient the ball <br /> valve so the lever is on the bottom when the 114" plug is facing sideways, see photo P. <br /> ❑ Install the 112" x 518" straight flare fitting into the ball valve. <br /> ❑ Reinstall the 518" flare tee back between the two preformed pipes, with the flare fitting <br /> facing the VP1000 and final tighten the flare nuts. The ball valve lever should be on the <br /> bottom and the 1/4" pipe plug horizontal facing you. Be sure the slope of the two pipes <br /> is downward and slopes to the tee. <br /> ❑ Measure and cut a length of 518" OD copper tube necessary to run from the pump inlet <br /> flare fitting to the flare fitting on the ball valve. Cut the copper tubing and slide on the <br /> flare nuts before flaring the ends. Carefully position this vapor tube to align fittings for <br /> tightening. Secure tubing connections to the pump and ball valve. Use care not to kink <br /> the tubing and maintain the slope downwards. <br /> Healy Systems, Inc. Website: http://www.healysystem.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson. New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation. Operation and Maintenance Manual (August 31, 2005) Fax. 603.882.5189 <br /> MORMON <br /> MMONWANNOMMR <br /> Healy Systems, Inc. —the innovative leader of Stage Il vapor recovery equipment <br />