Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION CORRECTION_SHEET <br /> The following checked and/or underlined items are to be addressed on plans: <br /> GENERAL <br /> Provide-the name and _address -of the facility. -56-, F'e'e- sAel-It" <br /> (!)P- 2. rovide the name,.-address, and phone numbers of the contractor(s) , facility <br /> ownols), and operator(s). p.X e re s4 for-1 -Sep <br /> d 3. Provide four complete sets of plans. (One to be retained by this office). <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 6k4, plans .to scale in nonerasable blueprint.— <br /> CONSTRUCTION <br /> lueprint.`CONSTRUCTION STANDARDS <br /> OK 1 . Location(s) and number of tanks. -See {S <br /> k -2. Type of tank(s) to be installed. <br /> A. Steel clad with fiberglass reinforced plastic. , <br /> 1 . 35,000 to E40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. ,6r��_l�rzc_ <br /> Fiberglass -� Dwr_s r�tw (7 See �'� ,� 'as <br /> 1 . Striker plate dimensions and materials. '�-= P PIS <br /> 2. Striker plates under all accessible openings:--S&-4, ; � �-�- <br /> �! Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion- engineer. or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required). <br /> Q�C <br /> Other types of tanks <br /> 1�if/nstruction specification standards for durability. <br /> 3. Tan . pacity (List specific gallonage). Ue. �er" P,6 <br /> ,_4. ' ontents to be stored in each tank (Be specific). <br /> A. Verification of product computability with the tank(s), piping, monitoring <br /> IFvice(s) , epoxy or silicone glues, etc. <br /> List testing organization and approval . <br /> G1L provide ma ufacturers written installation instructions. (Include allt' ipin , <br /> mo s, tanfts, etc. ) <br /> V O/G 71.E 25'd4- —5;5%f ��ate�let-+r <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> is required on BOTH the Primary and Secondary containment systems. <br /> Double walled tanks using pressure or vacuum testing to monitor annular <br /> space are exempt from testing secondary container. <br /> Note - NFPA 329 "Precision Test" required upon completion of installations. <br /> ne test result copy to be sent directly to this department from the <br /> testing company. <br />