My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans 8 applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsitc as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location or repairs and/or replacements. If repairing a component• describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> r— ----------- ------- <br /> h. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 2 <br /> 2 'd 24139194602 OUI 5.aozoej,4uo3 nI 01113 CIES :21 60 60 -tew <br />
The URL can be used to link to this page
Your browser does not support the video tag.