My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Jaha*od& Fuel 24323 N Hwy 99 Acampo(0054300) <br /> 5. Contact Aris Cacapit(468-3453)to arrange the following inspection(s)(a 48-hour notice <br /> is required): <br /> a. The EHD must witness the functionality of the monitoring system to ensure that <br /> monitoring has been restored to meet the requirements of California Code of <br /> Regulations Title 23 and the Health& Safety Code. <br /> 6. If concrete is being broken near the UST,pipeline and tank integrity testing must be <br /> performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> guidelines. Results must be received by the EHD within seven days of returning the <br /> facility to operating condition. <br /> 7. An"Underground Storage Tank Certification of Installation/Modification" form(form C) <br /> shall be submitted by the owner or the owners'agent [pursuant to(CCR) 2635(d)] before <br /> this upgrade will be considered complete by EHD. <br /> 8. Permit expires 180 days from date of approval. If an extension to the expiration date is <br /> required, a written request must be submitted to the EHD prior to the expiration date. <br /> Thank you, <br /> l� <br /> Aris Cacapit, EHS <br /> Environmental Health Specialist <br /> 600 E.Main St. <br /> Stockton,CA 95202 <br /> (209)468-3453 <br /> acacapit@sjcehd.com <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.