Laserfiche WebLink
RE: Jaha*od& Fuel 24323 N Hwy 99 Acampo(0054300) <br /> 5. Contact Aris Cacapit(468-3453)to arrange the following inspection(s)(a 48-hour notice <br /> is required): <br /> a. The EHD must witness the functionality of the monitoring system to ensure that <br /> monitoring has been restored to meet the requirements of California Code of <br /> Regulations Title 23 and the Health& Safety Code. <br /> 6. If concrete is being broken near the UST,pipeline and tank integrity testing must be <br /> performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> guidelines. Results must be received by the EHD within seven days of returning the <br /> facility to operating condition. <br /> 7. An"Underground Storage Tank Certification of Installation/Modification" form(form C) <br /> shall be submitted by the owner or the owners'agent [pursuant to(CCR) 2635(d)] before <br /> this upgrade will be considered complete by EHD. <br /> 8. Permit expires 180 days from date of approval. If an extension to the expiration date is <br /> required, a written request must be submitted to the EHD prior to the expiration date. <br /> Thank you, <br /> l� <br /> Aris Cacapit, EHS <br /> Environmental Health Specialist <br /> 600 E.Main St. <br /> Stockton,CA 95202 <br /> (209)468-3453 <br /> acacapit@sjcehd.com <br /> Page 2 of 2 <br />