Laserfiche WebLink
i F. In-Tank Caatg!n9/SYH Eg#ennt: eCbeck this box if tankgauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> COm lets the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below,describe now and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the folio ine checklist: <br /> PYes <br /> No* For equipment start-up or annual equipment certification, was a leak simulated to ver fy LLD performance? <br /> N/A (Check all that apply) Simulated leak rate: R(3 g.p.h.; ❑' g.p.h; ❑ rn g.p.h. <br /> No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> No* Was the testing apparatus properly calibrated? <br /> NoFor mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ❑ Yes ❑ NoA* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/ <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 4 N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. 11 <br /> H. Comments: <br /> Page 3 of 3 <br /> 03/Ul <br />