Laserfiche WebLink
A Results of Testing/Servicing • • <br /> Software Version Installed: <br /> Com late the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> I EX Yes I ❑ No* Is the visual alarm operational? <br /> Yes ❑ No* Were all sensors visual!y inspected, functional!y tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> ❑ Yes No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑ Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as. the primary tank overfill warning device (i.e. no <br /> CX N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> = G rl fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* P/No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes Ll No* Was monitoringsystem set-upreviewed to ensure proper settings?Attach set u reports, if applicable <br /> ja'Yes ❑ No* Is all monitoring equipment gperational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: �I V\(, "i e-jA WAS CAc)r C)-tr <br /> Page 2 ora 03/01 <br />