My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F'. In -Tank Gauging I SIR Equipment:. ® Check this box if tank ga is used only for inventory control. <br />❑ Check this box if no tank Ong or SIR equipment is Installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ <br />Yes <br />❑ <br />No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled property? <br />❑ <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />' In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comoleta the followino checklist: <br />® <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ <br />N/A <br />Simulated leak rate: ® 3 g.p.h.; [10.1 g.p.h ; ❑ 0.2 g.p.h. <br />® <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® <br />Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />® <br />Yes <br />❑ <br />No' <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off If the LLD detects a leak? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does [tie turbine automatically shut off If any portion of the monitoring system Is disabled or disconnected? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />N/A <br />❑ <br />Yes <br />❑ <br />No' <br />For electronic LLDa, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />® <br />Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencles were or will -be corrected. <br />Comments: <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.