Laserfiche WebLink
• The FE Petro STP-MLD increases until al.3 GPH the will close when several nozzles <br /> Mechanical .Line Leak Detector leak detector will never open. are open at the same time. <br /> combines streamline design, It will detect leaks even when Unique"internal dosign <br /> quality materials,solid there is ns much as 10 fi;et maintains leak sensitivity <br /> construction,and unique difl'e rence in elevation between and minimizes opening time <br /> features to ofleryou unmatched the point ol'the leak and the variation with vapor in the <br /> -perrormanao and maintenance, leak detector, pipeline:;and cutin es in the <br /> free reliability. furl temperature. The piston <br /> The STP-MLD is en noered Built In Quality <br /> � style design provides a res(:er- <br /> and built to mnintain its The use ore brass piston voir of fluid to compensate <br /> performance accuracy for years provides a rug;geil, nun-corrosive, for thermal contraction of the <br /> of operation. it will reliably strong material which will not <br /> product, red ucingthe. likeli- <br /> mainwin its ability to detrect deflect under pressure.'I'his hood of leak detector trips <br /> true leaks without any false drastically reduces the when the ternperaturn of the <br /> indication of leaks. potential for lockage product is higher than the <br /> Reliable post the piston temperature of the piping <br /> seal or 1' and surrounding <br /> The SIT-MLI)is a proven ea- <br /> 'a <br /> performer with exwnsive Easy Installation <br /> laboratory and field testing. Streamline design allows <br /> It comp]ics with U.S. EPA a easy access with socket or <br /> requirements 230.41(M and pipe wrench and high <br /> 280.44(A) for automatic leak <br /> strength socket head <br /> detection in pressurized pump- rap screw maG:rial <br /> • ing systems-It is third party ;:- will withstand any <br /> certified lbr porlbi-mance as ate, torque required for <br /> required by the Is'PA.a' assembly or removal. <br /> -The MLD is UC, listed for -,.y A vertical vont tube <br /> all blends of flammable motor r exit enables easier <br /> fuels including gmcoline, and more direct: <br /> kerosene,diesel furh and tube ernneetion_'1'he <br /> gasolincalcohol blends with SeparationsMd;I.) is UL listed <br /> alcohol concentrations from of the piston for installation <br /> 0 to 100%ethanol or methanol, Vroni the shaft. directly into all <br /> 15%MTBE with 8517n gasoline All dynamic FE Petro S'fl'Model <br /> or 17%TAMFand 83%gasoline. sealing surfaces submersible pumps; <br /> 'Chia unit will continuously are made of Red Jacket Model <br /> monitor pressurized pumping 'teflon on brass P33R1,P75S1,P150S1, <br /> and will indicate any size leak. or stainless W minimize AGP33R1,AG1'7551,and <br /> I,calcs greater than 3 gallons corrosion and wear,and are AGP150S1 pwups,or 1.1okheim <br /> per hour(('rPH)are indicated resistant to damage from Model 585A-34 and 585A-150 <br /> by greatly reduced output from abrasives in the fuel.There is pumps.Auxiliary housing is <br /> the pump of approximately 2 no plating or coating that will not necessury when installing; <br /> gallons por minute(GPM), peel or wear through. the MLD into any of these <br /> I..cak_c less than 3 GPH aro model pumps, <br /> indicated by the leak detector Unique Features When installed in a Red <br /> taking;longer than the nor•rrra l The MT.D stays open when Jacket pump, iL is not necessary <br /> 3 seconds to opens"* The smaller pumping for maximum product to remove th4�leak detector <br /> • the leak the nearer to 3 seconds delivery to line pressureas low when replocinti the capacitor, <br /> opening time, as the leak gats as 1 psi.There is never the providing it safer work <br /> nearer Lo 3 Glel-f, 1•I1e time concarn that the leak detector environment. <br /> *When flexible piping is installer], rise STP-MLD-E. <br /> '.'*Avoid longer opening times when pumping;diesel or kero:+rne by using. . <br /> STP-MLD-D.. <br /> 9 'd 2i C9T9t,602 nl 02T13 eLT eTT 60 20 JeW <br />