My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006 - 2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
2300 - Underground Storage Tank Program
>
PR0231947
>
COMPLIANCE INFO_2006 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2010
RECORD_ID
PR0231947
PE
2361
FACILITY_ID
FA0004345
FACILITY_NAME
JAHANT FOOD N FUEL STOP
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
01
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\24323\PR0231947\COMPLIANCE INFO 2006 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2010
QuestysRecordDate
2/10/2017 12:43:22 AM
QuestysRecordID
3335338
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> A Results of Testing/Servicing s' <br /> Software Version Installed: /L50( 1 <br /> Complete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> Ld"Ves ❑ No* Is the visual alarm operational? <br /> JW'Y—es ❑ No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> )0'N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) Sensors;.B')Sispenser Containment Sensors. <br /> Did you confirmpositive shut-down due to leaks and sensor failure/disconnection?mss; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ,Z N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> SII oin s and operating roerl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes d No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; L)Water. If es,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes ❑ No* Is all monitoring equipment 9perational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Page 2 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.