Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for JAHANT FOOD N FUEL STOP as of August 01, 2018. <br /> open violations from April 12,2018 inspection <br /> Violation#109-Failed to test secondary containment. <br /> The 89 octane product line secondary pipe was repaired and tested on 07/06/2017 and six month testing was due <br /> by January 2018. Testing has not been completed and is 3 months past due. Secondary containment testing is <br /> required six months after installation and at least every 36 months after. Immediately schedule this test and provide <br /> 48 hours notification to the EHD. <br /> Page 1 of 1 <br />