Laserfiche WebLink
Dynamic Back Pressure Test <br /> Allorda-TeSt <br /> 416 2nd Street TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 ® Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE:8-29-18 UST ® AST ❑ <br /> SITE NAME: JAHANT FOOD& FUEL TECHNICIAN NAME DAVE WINKLER ❑ PT ❑ Startup Test ® Compliance Test <br /> Address:24323 N HWY 99 AGENCY- 1,9-TVAP NORTH <br /> City:ACAMPO CA I declare, under penalty of perjury under the laws of the state Insvector:OCTAVIO <br /> of California that based on information and belief formed <br /> Phone: after reasonable inquiry, the statements and informationEl SEP 2 7 20' <br /> provided in the document are true,accurate,and complete. Present ® Not Present <br /> Contact: SINGH $ <br /> Confirmation# TECH SIGNATURE:W <br /> Permit or Facility#N3406-1-4 ENVIRONMENTAL HEALTH <br /> EPARTME <br /> #DISPENSERS 4 DISPENSER Make: WA WE NOZZLE Make:HEALY PV Valve Make:HUSKY T <br /> #TOTAL NOZZLES 8 Model: Model.900 Model: 5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ❑ ASSIST® Assist Type:CAS/LSD <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 89 91 ALL Initial pressure before testing--0.72 tt we <br /> #Nozzles per Tank 8 8 8 8 <br /> EQUIPMENT <br /> Actual Tank Capacity 10032 5016 5016 20064 Deca : Blockage: <br /> Gasoline Volume 2371 2240 1214 5825 <br /> Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(Capacity minus Volume) 7736 2760 3786 14282 <br /> Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial EVR EVR EVR EVR <br /> Digital Manometer ® Digital Manometer ❑ <br /> Initial Test Pressure(Inches water)2/0 2.0 Equipment Calibration Date: 7-9-18 <br /> 1.99 Drift Check End Value: 0 <br /> PSI 1 Minute(Inches water) Nitrogen Intro.Point: PHASE 1 <br /> PSI @ 2 Minutes 1,98 <br /> PSI @ 3 Minutes 1.96 Allowable Fill Time 2 scfm 7.21 <br /> PSI @ 4 Minutes 1.96 Time 1:2.22 <br /> Final Pressure @ 5 Minutes(Inches water) 1.95 Time 2• <br /> Allowable Final Pressure CARB 1.91 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> Pressure(if due),and Parts& <br /> ------- <br /> ------- ------- ------- PASS Repairs Are Listed on Page 2. <br />