Laserfiche WebLink
°P Environmental Health Department <br /> SAN J OAQ U I N <br /> Q . Linda Turkatte, REHS, Director <br /> " COUNTY <br /> Kasey Foley, REHS,Assistant Director <br /> cy , r Greatness grows hey e. PROGRAM COORDINATORS <br /> Robert McClellan,REHS <br /> Jeff Carruesco,REHS, RDI <br /> Rodney Estrada,REHS <br /> Willy Ng,REHS <br /> Muniappa Naidu,REHS <br /> June 12, 2017 <br /> MEGAN MITCHELL <br /> ELITE IV CONTRACTORS <br /> 2535 WIGWAM DR <br /> STOCKTON, CA 95220 <br /> Re: JAHANT FOOD N FUEL STOP SR0077671 <br /> 24323 N HWY 99 <br /> ACAMPO, CA 95220 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to break concrete at the 89 tank, and investigate the secondary line leak, and <br /> make necessary repairs on the secondary piping on the underground storage tank (UST) system at the <br /> above noted address. The permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Aaron Hang at (209) 468-3453 to arrange the following appointments (a 48-hour notice is <br /> required for inspection appointments). <br /> Secondary piping soap test: One-hour pressure test for all exposed piping, per <br /> manufacturer's guidelines. If there are no manufacturer's guidelines. Test shall be performed <br /> using an applicable method specified in an industry code or engineering standard. <br /> Secondary containment piping pressure test(after surface repairs/restoration) <br /> 24-hour hydrostatic test (or equivalent) on any impacted/exposed UDC sump(s), as <br /> applicable. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br /> and approval. <br /> 4. Since concrete will be broken near the 89 tank, a secondary containment test must be performed on <br /> the 89 tank once concrete is poured in accordance with the manufacturer's guidelines. <br /> 5. Secondary containment testing for the impacted piping is required six months after installation. <br /> Provide 48 hours notification to the EHD when this test is scheduled. <br />