Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1-87 Sump#2-89 Sump#3-91 Sump#4-Diesel <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 48" 48" 48" 34" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 16"Vapor 19"Vent 29"Vapor 19"Vent 23"Vapor 17"Vent 12" <br /> Highest Piping Penetration: 15"Product 16"Product 16"Product <br /> Height from Tank Top to Lowest 13" 13" 13" 15" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested' Water Level 23" Water Level 33" Water Level 27" Water Level 19" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes Yes <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes Yes <br /> shutdown?' <br /> Was fail-safe verified to be No No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: <br /> Test Start Time: 8:50 9:00 9:40 10:45 <br /> Initial Reading(R,): .001 .001 .001 .001 <br /> Test End Time: 9:20 9:30 10:10 11:15 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes Yes Yes <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended.follow-up_forfailed tests) <br /> A <br /> OCT 0 6 Z017 <br /> EN IR L <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />