My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK SYSTEM <br /> DESIGNATED UST OPERATOR MONTHLY INSPECTION REPORT <br /> ~-- Facility Name: Inspection Date: LoqI20 1 O <br /> Facility Address: L{p 55 S. City' <br /> Name of Designated UST Operator Conducting Inspection: RobertBarnhart <br /> Intimation cil Certification No.: 5252540-UC Expiration Date: 12/23/2011 <br /> Signature: Phone: <br /> t�- (209)604-9336 ext. <br /> N/A- otAonlientile <br /> Item MONITORING PANEL/ALARM HISTORY Yes No N/A <br /> 1. Is the monitoringsystem powered on and in proper o eratin mode? <br /> 2. Is the monitoringsystem not current) showingan leak alarms? <br /> 3- Is the Alarm History Report/log for the previous month available, and has it been reviewed by the El <br /> Designated UST Operator? Attach a co o the alarm histo re ort/[o to thrs rw action orm. <br /> 4. Has each alarm for the revious month been responded to a ro natal ? <br /> UST SYSTEM INSPECTION <br /> 5. Are tank-top containment sumps free of water, debris,and hazardous substance? Note:lfthe annver to Item 4 was"Yes."skip <br /> to Item 6. Sumps where an alarm has occurred in the past month must be insImoted if a qualified srr hx technician has not responded to, and <br /> property adtimssed,the cause of the alarm.Documcntatton veroing gegropriate servtcy should be attached to this mporL <br /> Yes I No I" Yes No q <br /> Sum Location: Sum Location: 4 <br /> Sum Location: Sum Location: <br /> 6- Ares ill buckets containment structures free of water, debris, and hazardous substance? <br /> Yes No N/A Yes No N/A <br /> Tank I ID— 4zTank 41D— <br /> TankI Lj El Tank 5 ID— <br /> Tank31P— /1G rYkt. I b4 Lj Ll Tank 61D- <br /> 7. Are under-dis nser containment areas free of water,debris and hazardous substance? <br /> Yes I No I N/A t 1r JANCI Yes No N/A <br /> -Dispenser 1/2 ❑ Lj I Dispenser-9/10 El <br /> -Dispenser 3/4 Dispenser— 11/12 El El <br /> -Dispenser 5/6 Lj I Lj j Dispenser- 13/14 <br /> Dispenser—7/8 Lj I U I Dispenser— 15116 <br /> 8. Leak detection is eroperly located within under-dis enser containment. <br /> Yes NoN/A livo f t'S Yes No N/A <br /> -Dispenser- 1/2 ❑ Dis a ser-9/10AC 0 <br /> -Dispenser-3/4 Dispenser— I I/12 <br /> Dis enser-5/6 Dispenser- 13/14 <br /> Dis enser-7/8 ❑ Dis enser- 15/16 <br /> .. .y,. ,. <br /> PAPERWORK INSPECTION Yes No N/A Date Done <br /> 9. Monitoring System Certification was completed within the past 12 months? t—p <br /> 10. Line Leak Detectors were tested/certified within the past 12 months? I LHJ liz— 31-0 <br /> 11. Spill bucket containment structure)testing completed within the past 12 months? L—31—p <br /> 12. Line tightness testing completed within therequired time frame? LZI <br /> 13. <br /> Secondarycontainment tests tom feted within the r uired time frame? p <br /> 14. Enhanced Leak Detection completed within the required time frame? <br /> 15. Other required testing/maintenance was completed within required time frame? List testImaintenance items belaw.) <br /> Describe Test/Maintenance: D,/9/ fD <br /> Describe Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Yes I No I N/A <br /> 16. Have all facili employees received therequired on-the-job training within the past ear? <br /> 17. Have all facili em to ees hired within the past 30 days received the required on-the-'ob trainin .? <br /> Note: Explain any"No"answers in the"Comments"section on the following page.Those issues require corrective action from <br /> the UST owner/operator. <br /> UN-057.12 www.unidocs.org 9/26Ns <br />
The URL can be used to link to this page
Your browser does not support the video tag.