Laserfiche WebLink
D. Results of Testing/Servicing <br /> software Version Installed: 5 <br /> Complete the following checklist: <br /> a Yes ❑ No* Is the audible alarm operational? <br /> Yes ❑ Is No* the visual alarm operational? <br /> Yes ❑ No* Were all sensors visually ins ected,tune onally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> 4L N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) IY,Sump/Trench Sensors; U116ispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks Alld sensor failure/disconnection? ❑ Yes; ❑No. <br /> JR!Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no- <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? 90 % <br /> Yes* ❑ No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) C3 <br /> Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was-monitoring s stem set-up reviewed to ensure proper settin s?Attach set up repo ,if applicable <br /> JZ1 Yes ❑ No* Is all monitoring equipment o erational er manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: K9 4e4K Ohe-l-ee-TOr WrfS R�:Ofhccd t Ne.W oNe- 7fex7-4 f- CarV*kd <br /> —,q.b —.--.-- ------ <br /> �7 +- # )l fvn+d SeNror.L Alre, �e, led d�/m A1errA <br /> Page 2 of 3 03/01 <br />