My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/8/2018 9:49:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 2008-2012.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REDJACKET_ <br /> V� ¢c���cYr'.ona �e <br /> Constant Pressure Output <br /> The Red Jacket CPT(Constant Pressure Turbine)uses Controlled Pressure Technology. This <br /> technology measures the pressure downline from the pump with a pressure transducer.The <br /> controller reads the pressure and then adjusts the fundamental frequency and power applied <br /> to the motor to maintain a constant flow. <br /> Line-Leak Detection <br /> The Red Jacket CPT system can provide compliance with EPA requirements for hourly leak <br /> detection,monthly monitoring of leaks of 0.2 gph or greater,and annual monitoring for leaks <br /> of 0.1 gph or greater. <br /> Hourly Leak Detection:This feature provides positive shutdown when a 3-gph or greater leak <br /> is detected.The 3-gph leak detection feature replaces the mechanical line-leak detector that <br /> was previously installed on the pump. <br /> Monthly and Annual Monitoring: By activating the monthly and annual monitoring capabili- <br /> ties of the CPT,total compliance for lines is possible without the installation of extra hard- <br /> ware on the piping system. <br /> Line Leak Functionality Testing:The manual line testing of the leak detecting system,which <br /> is required by EPA,for hourly monitors can be done by using snap taps installed on the line- <br /> test port of the packer-manifold. The snap tap fittings used with an FXT tester can check the <br /> functions of the leak-detecting system within a few minutes.The FXT tester offers a very <br /> quick and clean functional test of the hourly monitoring feature,in addition to running diag- <br /> nostics,without spilling product. <br /> Stand-alone Pump Operation <br /> The CPT Controller's microprocessors are preprogrammed from the factory for stand-alone <br /> operation. Instructions in Chapter 3 explain how to set the DIP switches for stand-alone and <br /> tandem operation,and instructions in Chapter 4 explain how to set the pump pressure to <br /> achieve the maximum flow rate of 10 gpm per nozzle. <br /> Tandem-Pump Operation <br /> When two CPT pumps are required to maintain proper flow,these units can be programmed <br /> to operate in tandem. The installer can designate one controller as the master unit and the <br /> other as the auxiliary unit. The master controller monitors line pressure to maintain proper <br /> flow. <br /> Whenthemaster controller receives the dispense-enable signal,the primary pump starts.The <br /> controller varies the speed of the pump depending on the pressure in the line. When the pri- <br /> June 99 1-2 CPT Controller <br /> Installation and Operation Manual <br />
The URL can be used to link to this page
Your browser does not support the video tag.