Laserfiche WebLink
10/22/2008 12:01 9163712450 BZ MANITANENCE PAGE 09/10 <br /> SWRCB,January 2002 Pcae_of <br /> S. FILL RISER CONTAINMENT SUMP TESTING <br /> Facility is Not E u' cd With Fill Riser Containment Sumps 0 <br /> Fill Riser Containment Sumps arc Proscnt,but were Not rested 0 <br /> Test Method Developed By: 0 Sump Manufacturer X Tndustry Standard n Professional Engineer <br /> O Other(Specify) <br /> Test Method Used: f.7 Pressure ❑Vacuum X Hydrostatic <br /> O Other(Spee) <br /> Test Equipment Used: Incon TS-STS Equipment Resolution: <br /> Kw',�G.s ` j.33{ r s o Ki✓Ss::.: 'a2Gt, <br /> Fill Sump#87 Fill Sump#89 Fill Sump 4"91 Pili Sump# <br /> Sum Diameter: 53" 53" 53" <br /> Sump Depth 52" 57" 57" <br /> Height from Tank Top to Top of N/A NIA NIA <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 26" 25" 27" <br /> Electrical Penetration: _..,.......---- <br /> Condition of sump prior to Dry Dry Dry <br /> testing: <br /> Portion of Sump Tested 2"Above Piping 2"Above-Piping 2"Above PI 1n <br /> Sumn Material: Fiber lass Fiberglass Fiberglass <br /> Wait time between applying <br /> pressure/vacutan/water and 3 min. 3 min. 3 min. <br /> starting test: <br /> OTnitial <br /> Start'rime: 11:53 a m. 11:53 a.m. 11:53 a.m. <br /> Reading r): 2.7054 15758 4.1296 <br /> End Time: 12:08 .m. 12:08 .m. 12:08P.M. <br /> Final Reading(Rr): 2.7063 1.5755 4.1285 <br /> Test Duration: 15 min. 15 min. 15 min. <br /> Chan a in Readin (R Rt)' 0119 .003 .0011 <br /> Pass/Fml Threshold or Criteria 002 002 002 <br /> TRW ,'1A Mal : .X,trhas.?,1� 3r1. i!�5a I3 Fd►l: k� P��s : 11 .ai <br /> Ls there a sensor in the sump? X Yes O No X Yes CI No X Yes ❑No O Yes O No <br /> Does the sensor alarm when <br /> either product or water is O Yes 0 No A IJ Yes O No A O Yes O No O Yes 0 No 11 NA <br /> detected? <br /> Was sensor removed For testing? ❑Y No X NA O Yes No X NA 0 Ycv No X NA O Yes O No DNA <br /> Was sensor properly nilnced and es O No X NA es O No X NA r ca O No X NA ❑Yes 0 No ❑NA <br /> vc flied functional after testin ? <br /> Comments include it f nnatian on repairs made prior to testing,and recornmended follow-up forfailed lesls) <br />