Laserfiche WebLink
0R ACKET <br /> T.,oN,as_ <br /> F <br /> e-leak alarm occurs,try adjusting the functional element by turning the adjustment <br /> l the way down and then back up two turns.This will set the functional element at <br /> psi. <br /> When the adjusting screw is fully down,the relief pressure is about 30 psi.When the <br /> adjusting screw is fully up,the relief pressure is about 3 psi. <br /> After adjusting the screw,tum the pump on and off;then,observe the static pressure. Three <br /> methods exist for verifying the relief pressure setting: <br /> The pressure reading can be taken from the CPT Controller using a Tech Pod(see"Tech Pod <br /> User's Guide"). <br /> Relief pressure settings may be observed using existing electronic line-leak detection con- <br /> soles(see appropriate operating instruction manual). <br /> Pressure may be observed using a gauge attached at the impact valve or the line-test port at <br /> the pump(see appropriate operating instruction manual). <br /> If the pressure is not correct,adjust the screw again,as explained in step 2. <br /> When the pressure is correct,replace the brass cap until it touches the functional element <br /> body. <br /> tice If a siphon system is used,the operating pressure of the pump must be <br /> Notice approximately 5 psi greater than the setting for the functional element <br /> Calibrating the Flow Rate <br /> To calibrate the flow rate,it is necessary to determine the volume of fuel that is pumped dur- <br /> ing a set time interval: <br /> Tools:You will need the following: <br /> a stop watch,and <br /> a 5-kaf(or ranger)container approved for flamin fe liquids. <br /> June 99 48 CPT Controller <br /> Installation and Operation Manual <br />