Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/ inert the tank(s): <br /> 16'-* / kovo 64(- 671 . <br /> b. Tank/Plpingp Hauler. <br /> QName I / <br /> Address City Zip <br /> Phone No.( ) <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Name ti 1A <br /> Address City Zip <br /> Phone No.( ) <br /> EPA ID# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> N 1A <br /> 10. Describe how the excavation will he backfilled with suitable material upon removal: <br /> /A <br /> 11. Handling of excavated soil: ti / <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> b) What will be the final destination of the excavated stockpile? <br /> c) Contaminated Soil Hazardous Waste Hauler. <br /> Name Hauler Registration # <br /> Address City Zip <br /> Phone No. ( ) <br /> Page 5 <br />