My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7303
>
2300 - Underground Storage Tank Program
>
PR0231226
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:31 AM
Creation date
11/8/2018 9:50:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231226
PE
2361
FACILITY_ID
FA0003814
FACILITY_NAME
TOSCO CORPORATION #30878*
STREET_NUMBER
7303
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07736021
CURRENT_STATUS
02
SITE_LOCATION
7303 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PACIFIC\7303\PR0231226\REMOVAL 1998.PDF
QuestysFileName
REMOVAL 1998
QuestysRecordDate
8/11/2017 4:05:05 PM
QuestysRecordID
3572010
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4'06-1998 9:00AM FRI#TAIT SACRAMENTO 916 635 2606 P_ 15 <br /> • <br /> BACKFILL EXCAVATION CERTMCATE <br /> Project Locazion ©DC7 ^ F1Cf L lrY # 5 2 1 <br /> Owner `�OSCo rnARk�r/ AQfLt — �I�dotte No. �9�G� Ss i'- 7Ca� <br /> Correractor n5 C r phone No.(1071 _571 f(c�_I iearse No. <br /> LNDICATE METHOD OF BACLSF U QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Cou+paetion Report withm 30 days of project completion,or <br /> 2, Submission of verificatiou,e.g., load ticket, within 30 days of project completion.that one of the following materials was <br /> placed in the excavation in 12• lefts: <br /> _ A. pea gravel–smooth, muuded material not more than One-half UM inch in diameter <br /> B. Crushed rock–self-compacting material not more tl= three (114) inch ie cross sectional <br /> em <br /> menutent. (Use of crushed tock will not be permitted for 1 if cantact will be made between the <br /> backfill material and tankslpipes made of poly ream Puss or similar materials.) <br /> DECLARATION <br /> I bereby terrify that a Soil Engineer's Compaction Report will be mbmlued within 30 days of tojeei completion,or submission of <br /> verification that the select material described above will be placed at a mmimam of 5ve (S) eubic yards per 1000 p�llon tank <br /> displacement and that the entire excavation will be bald llcd and compacted to mute compliance with the Uniform Budding Code <br /> Appendix Chapter 70. <br /> 8mena t <br /> A erlt pr- 6 vrlev i tie �t (tre=e k <br /> e <br /> �grtatnre <br /> Shall be the responsible managing employee on the license or mnhoriaed agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.