My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4501
>
2300 - Underground Storage Tank Program
>
PR0231233
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:23:56 PM
Creation date
11/8/2018 9:51:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231233
PE
2361
FACILITY_ID
FA0002479
FACILITY_NAME
7-ELEVEN INC #17334
STREET_NUMBER
4501
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017004
CURRENT_STATUS
01
SITE_LOCATION
4501 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PERSHING\4501\PR0231233\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/17/2018 6:27:41 PM
QuestysRecordID
3176678
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 1 of 1 <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed By: r Tank Manufacturer r Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: r Pressure r Vacuum f Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: au a Equipment Resolution: .20 <br /> Tank#T-1 Tank#T-2 Tank# Tank# <br /> ISTak lixemptFmm Testing?' r Yes r No r Yes r No r Yes r No r Yes r No <br /> Tark Capadry'. 10028 10028 <br /> Tania Metenal'. Steel Steel <br /> Tark Manufac rer total contanment total contanment <br /> Pnxectstared'. RUL PUL <br /> wat Eme xweenapgNngleme reniauummawara sWOng 5 min 5 min min min <br /> test <br /> Tel Stan Ti. 15:45:00 14:00:00 <br /> Initial Reading(RI): 15.00000 in.HG 15.00000 in. H2O <br /> Test 6a Time. 09:30:00 09:00:00 <br /> Final Rearing lRrp 14.00000 in. HG 13.50000 in. H2O <br /> Test Duration: 18.75 hr 19 hr <br /> Changeln Raeding(RpRp: -1.00000 in. HG -1.50000 in. H2O <br /> Pal Thewneld a cetera: +/-5.00000 +/-5.00000 +(- +/- <br /> Test Result: Pass Pass <br /> was serrtor rerraved ro"tesonl' r Yes r No r NA r Yes r No r NA r Yes r No r NA r Yes r No NA <br /> was sxxsarpmpeny replaoad and vaiifietllvxfianel arter tesArg! r Yesr Nor NA r Year Nor NA r Yesr Nor NA r VeSr Nor NA <br /> Comments(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> reg and sup annular were tested on 11-30-15, through the morning of 12-1-15. inconclusive test results on the sup annular <br /> prompted another test on 12-1-15 through the morning of 12-2-15.which are the results you see above. <br /> t Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems <br /> that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.