Laserfiche WebLink
r <br /> Site Preparation and T kallation Manual <br /> TLS-250i Tank Level %vi ing System *40 <br /> E. PROBE AND SENSOR CONDUIT INSTALLATION. F. PROBE AND SENSOR JUNCTION BOX INSTAL- <br /> (See Figure 5, '"175-250i Four-Tank System Wiring Installs- LATION. (See Figure 1.) Install a weatherproof electrical <br /> tion Diagram.-) junction box with Basketed cover on the end of each conduit <br /> WARNING: PROBE- AND SENSOR-TO-MONITOR WIRE run at the probe and sensor locations.Gasketing or sealing <br /> MUST NOT EXCEED 1,000 FEET. IMPROPER SYS- compound must be used at each entry to thejunction box to <br /> TEM OPERATION COULD RESULT IN INACCU- ensure a waterproof junction. The interior of the junction <br /> RATE INVENTORY CONTROL OR UNDETECTED box mustbe a minimum of Ili cubic inches. Use one of the <br /> POTENTIAL ENVIRONMENTAL AND HEALTH following approved units or equivalent: <br /> HAZARDS IF PROBE-AND SENSOR-TO-MONITOR <br /> WIRE RUNS EXCEED 1,000 FEET. RUNS OVER Manufacturer: Appleton Electric Co. <br /> 1,000 FEET ARE NOT UL APPROVED FOR THIS 1701 W. Wellington Av. <br /> APPLICATION. Chicago, 11, 60557 <br /> 1. Dig trenches as necessary to install conduitfrom the Phone: (.'312)'327-7200 <br /> monitor to each probe and sensor location. Probe and Pen No. Oty. <br /> sensor wiring must enter the monitor through the knock- <br /> outs located at the right-hand side or bottom of the JeDx-75 t <br /> monitor case. (See Figure 4.) [GC,,7ketJunct!,,n <br /> ox JBK-B t <br /> Box JB-GK-V 1 <br /> 2. Lay 1/2 inch rigid metal conduit from each probe and <br /> sensor junction box to a junction box or wiring Irough Manufacturer: Crouse-Iliuds Cu. <br /> located inside the building. Syracuse, NY 13221 <br /> Note: Probe and sensor wires can share same conduit and Phone: (315)477-7000 <br /> wiring troughs. IDeeedpaon Pert No. Oty. <br /> WARNING: EXPLOSION COULD OCCUR IF OTHER <br /> WIRES SHARE TLS-2601 PROBE AND SENSOR WIRE GRFx-139 t <br /> CONDUITSORWIRING TROUGHS.CONDUITSAND GRF-10 1 <br /> WIRING TROUGHS FROM PROBES AND SENSORS [G=C,-,=t. n GASK-643 t <br /> TO THE MONITOR MUST NOT CONTAIN ANY <br /> OTHER WIRES. G. MANHOLE,INSTALLATION. <br /> Layasingle3/4 inch rigid metal conduit.from t.he,junct.ion Note: Ensure thatthere is a sufficient amount of gravel <br /> box or wiring trough to the TIS monitor loealion. under the manhole for proper drainage. <br /> 3. The conduitcan enter the manhole through the bottom or Install a 14-inch minimum diameter approved manhole at <br /> the side,but the end ofthe conduit should be high enough each probe and sensor location. Offset the probe or sensor <br /> to reduce the chance of water covering the junction box riser pipes in the manholes for ease of junction box instal- .1 <br /> during heavy rain. lation and wiring.Leave room between thejunction box and V <br /> 4. Run 1/2 inch rigid metal conduit between breaker box and the manhole liner so that thejunction box can lw removed if <br /> TLS monitor location. necessary. <br /> F", r-L-C <br /> CIO <br /> IT <br /> 9 <br /> Figure 5. TLS-260i Four-Tank System Wiring Installation Diagram <br /> 4 <br />