Laserfiche WebLink
Im <br />L� <br />SWRCB, January 2002 '"1 ""O, Page of <br />9. SPILIJOVRRVII.i. CONTAINMENT ROWS <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: <br />N/A N/A <br />Equipment Resolution: <br />N/A <br />N/A <br />Bucket Diameter. <br />Bucket Depth: <br />Wait time between applying <br />pressureh awumhiater and <br />starting test: <br />Test Start Time: <br />Initial Reading (Ri): <br />Test End Time: <br />Final Reading (RI,): <br />Test Duration: <br />Change in Reading (Rt -Ra): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />I ❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />SPILL BUCKETS DONE WITH MONITER CERTIFICATION AND PASSED <br />