Laserfiche WebLink
r <br />r <br />r <br />r <br />SWRCB, January 2002 <br />Iwo <br />4. PIPING SUMP TESTING <br />Page _ of <br />Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer <br />X Other (Specify) SWRCB <br />Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (3pecify) <br />Test Equipment Used: INCON SUMP TESTING MONITOR SYSTEM <br />Sump #JUNK OIL Sump # <br />Equipment Resolution: <br />Sump # <br />Sump # <br />Sump Diameter: <br />42" <br />Sump Depth: <br />117' <br />Sump Material: <br />FIBERGLASS <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />24„ <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />37" <br />Condition of sump prior to testing: <br />FAIR <br />Portion of Sump Tested' <br />BOTTOM 39" <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)? <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail-safe <br />shutdown? <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was fail-safe verified to be <br />operational? <br />Yes No x NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />30 MINUTES <br />Test Start Time: <br />1318 <br />Initial Reading (R,): <br />6.9565 <br />Test End Time: <br />1333 <br />Final Reading (RF): <br />6.9555 <br />Test Duration: <br />15 MINJ2 TESTS <br />Change in Reading (RF -R,): <br />-0.0010 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002 <br />Test Result: <br />X Pass ❑ Fail <br />❑ Pass ❑ Fail <br />0 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />x Yes No NA <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />