Laserfiche WebLink
1101R 1.7 dwU4 lU'•4'7 rh• nLUCL 1IVC ICLrIIVULUL]LCO 1JJYJO 11JGC/O IU 1JPLJJP'»U� VW cc <br /> Pile A129727 W 9�l 171. 1 Tamed; 20p6-01-95 <br /> v <br /> 265 Bums Drive Yuba City.CA 95991 <br /> Tel: (590)871 Fax:(590)671-5208 <br /> Email: <br /> T 9 c N w o 1- o e r 9 s www,bWe-11/1e%&AOIO i -COM <br /> BItWiln <br /> prior to InetellHon <br /> 1 <br /> 2j lee eeoroar g%Mjand eidn DMIRM90 <br /> 3) Fonow OUGHT eetette code <br /> inj1plWo-n procedure <br /> • Ensure ell bulkhead and sump surfaces are cleaned with Acetone <br /> ( and dry before Installation <br /> • Sand fiberglass sumps lightiyto remove gel cost <br /> • Use non bated side boat as a drilling template and drill holes for the <br /> appropriate bolt pattern <br /> • Apply a 112 inch bead of Blue bond 801 Gasket materia)to the boot <br /> flanges <br /> • Install beck plate bulkhead (outside sump) pushing ail bolts through <br /> the drilled holes <br /> • iWall front bulkhead over the protruding bolts <br /> • Tighten all scraws and nuts to maximum 35-40 inch Ib torque <br /> • Tighten all band damps around pipe, not to exceed 2530 Inch lb <br /> torque <br /> • Remove any excess Blue bond 801 from sump wall around the toot <br /> flange <br /> SPE[ <br /> 901d ccbce9b902i of 9Sb9 Lsg 291 I ISd ?JJ Ad EO : 1 b002 91 duo <br />