Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed: <br />!`.......lata 4ha Fnllnwinn rh arlrlict• <br />® Yes <br />❑ No* <br />Is the audible alarm operational? <br />® Yes <br />❑ No* <br />Is the visual alarm operational? <br />® Yes <br />❑ No* <br />Were all sensors visually inspected, finictionally tested, and confirmed operational? <br />❑ No* <br />Fere all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br />® Yes <br />not interfere with their proper operation? <br />El No* <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br />El Yes <br />® N/A <br />operational? <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br />® Yes <br />❑ No* <br />monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br />❑ N/A <br />positive shut down? (Check all that apply) ❑ Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br />Did you confirm positive shut down due to leaks and sensor failure/disconnection? ❑ Yes; ® No. <br />❑ No* <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br />El Yes <br />® N/A <br />mechanical overfill prevention valve is installed), is the over -fill warning alarm visible and audible at the tank <br />fill point(s) and operating ro rl ? If yes, at what percent of tank capacity does the alarm trigger? % <br />®'Yes* <br />NJ No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced <br />and list the manufacturer name and model for all replacement parts in Section E, below. <br />❑ No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ® Water. If es, describe causes in Section E, below. <br />EYes* <br />No* <br />Was monitorin s stem set -u reviewed to ensure ro er settin s? Attach set u re orts, if a licable <br />❑ No* <br />Is all monitoring equipment oerational per manufacturer's specifications? <br />* In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />--SUCTION SYSTEM - NO POSITIVE SHUTDOWN REQUIRED <br />--WATER IN DIESEL PIPING SUMPS (DIESEL TANKS ARE ABOVE -GROUND) <br />ANNUI.AIL SEN -sot <br />nJ WAsTC <br />6 1 L IIJNIC 3 - <br />VI2t3a3I DJ A(_ <br />1=LDA i <br />IJY4A,eS�,9Tic. <br />S&ASOl2 C1321AC <br />Fa,0;b AAAJI-A 2) <br />Page 3 of 4 <br />Monitoring System Certification <br />