My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2300 - Underground Storage Tank Program
>
PR0232495
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2023 1:44:43 PM
Creation date
11/8/2018 9:52:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0232495
PE
2361
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\P\PESCADERO\1535\PR0232495\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
12/6/2016 12:58:59 AM
QuestysRecordID
3271591
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)r Yellow Freight <br />(SB 989 Repairs) <br />1535 E. Pescadero Way, Tracy, Ca <br />Results of the failed SB 989 Testing are attached for your review. The intent of this submittal is to <br />address the failures by the application of Blue Late Repair fittings. <br />Blue Line Split Repair Entry fittings shall be utilized to repair the existing failed entry or <br />penetration fittings as delineated on the test results. In some cases, and in addition to the failure of <br />a `wall penetration" or "entry" fitting failure, the fiberglass attachment to the tank collar requires <br />repairs. It is also the intent, if necessary, to apply 3 layers of fiberglass matting with Isophalyic <br />resins to this sump/collar connection. (It is understood that only the Tank Manufacturer make <br />FRP repairs to the tank shell). <br />The secondary lines however shall require further investigation. It is the intent if this submittal to <br />provide and install the necessary secondary test boots and to perform locating only. Once the <br />underground issue are itemized and locate then the SJCEHD shall be provided an addendum <br />detailing these phase 2 repairs. <br />Upon successful completion of the above the site will then be ready for inspection. <br />• San Joaquin County Inspector shall be provided a minimum of 72 hours notice for any <br />requested inspection. All inspection times are the discretion of the San Joaquin County <br />Health Dept. <br />• A Blue -Line certified individual will perform all repairs, no exceptions. Copies of Tank- <br />Tek's Blue -Line cent's, and ICC are attached with this submittal <br />• All personnel on this project shall possess a minimum of 40 Hour OSHA course or the 8 <br />Hour OSHA refresher course. Individuals unable to demonstrate this training will not be <br />allowed on the premises. <br />• A copy of the SB 989 Certification shall be forward to the San Joaquin County Health <br />Dept within 30 days of the test. <br />
The URL can be used to link to this page
Your browser does not support the video tag.